FAQ

Technical

  • Yes, we do. Our reinforcement detailing team provides high-quality 2D and 3D detailing services, including automated bar bending schedules, complying with major international codes for commercial, industrial, and infrastructure projects, in accordance with client specifications.

  • All documents and drawings are prepared in digital format and can be delivered in any format specified by the client.

  • Yes, we do. Our backup server routinely checks the ‘file modified’ attributes of all files on the connected hard drives and compares them with the previous backup. Any modified files are then securely backed up to an external hard drive connected to the server.

  • The turnaround time is influenced by the complexity and urgency of the project, the geographical time zone, and the availability of staff to work concurrently. However, we have ample resources to efficiently manage design and detailing projects and we will be adhering to the agreed submission schedule during the initiation.

Quality

  • We follow a comprehensive three-tier quality control process before releasing any drawings or documents to our clients. Initially, the detailer or engineer conducts a self-check using a detailed checklist, addressing any necessary corrections. The document is then submitted for the first level of review, accompanied by the signed checklist. The first reviewer verifies the document against the checklist, and any required adjustments are made by the detailer or engineer. The first reviewer re-verifies the updates, after which the document proceeds to the second-level review, again with the signed checklist. The second reviewer performs a final quality check to ensure the integrity of the drawings and documents. Upon successful completion of all checks, the final outputs are delivered to the client in the desired formats. After the project’s conclusion, we actively seek client feedback to identify areas for future improvement.

  • We have a skilled software development team and a customized solution in place for generating Bar Bending Schedules (BBS). The accuracy of both the outcomes and the software is rigorously monitored to ensure a 99% accuracy rate. Additionally, we offer the flexibility to tailor the Bar Bending Schedule to comply with the specific codes or standards required for the region.

Resources

  • All of our technical staff are highly qualified. Our team consists of 76% graduate and postgraduate engineers, 22% diploma graduates from technical schools, and 2% IT support professionals.

  • Yes, we are familiar with almost all buildings codes,including IS,ACI, BS, AISC Code, Eurocode.

  • Typically, we can mobilize a team within 3 days for short-term projects requiring fewer than five employees. For projects that require a larger workforce, mobilization will take a minimum of one week following project confirmation.